Searose News

Case Study: Duct Install ┃ Pallet Manufacturer

duct installation

New Ducting Install

Searose Environmental installed all new spiral ducting into a leading Brisbane pallet factory. All the ducting was connected to a new dust collector set up on site

This project was to install new ducting to extract from 10 machines in the pallet production facility. Searose worked off drawings supplied by the client and used spiral duct as requested.  First hooking up the dust extractor with large 800 diameter ducting utilizing a Manitou and scissor lift to guide the ducting into an engineered structure that was to be used to support the duct.

Once all of the large ducting was installed into the shed, we moved onto connecting the machines with smaller spiral duct sizing and flexible hose supplied by MX Dust Pty Ltd.

install new ductingducting installationpallet master